[Contact] | [Meetings] | [Reports] | [Documents] | [Literature] | [Publications/Presentations] | [Algorithms] | [Data] | [Deliverables] |
Feedback from UAG at PM1, Copenhagen, 24-25 April, 2003
Month |
Type |
Date |
Place |
Agenda/Minutes |
Details |
---|---|---|---|---|---|
1 |
Kick-Off Meeting (KOM) |
4-5 Nov, 2002 |
Bremen |
KOM minutes | |
6 |
Progress Meeting 1 |
24-25 Apr, 2003 |
DMI, København |
PM1 agenda, PM1 minutes, PM1 Presentations |
Thu, 24 Apr, 9:30 - Fri, 25 Apr, 15:00 |
12 |
Progress Meeting 2 | 30-31 Oct, 2003 |
SMHI, Norrköping |
PM2
agenda, PM2 minutes, PM2 Presentations |
Thu, 30 Oct, 13:00 - Fri, 31 Oct, 13:00, room "Nikkaluokta 24/191". More details |
18 |
Midterm Review | 10-11 May 2004 | met.no, Oslo |
MTR
agenda MTR minutes, MTR Presentations |
Mon, 10 May, 13:30 - Tue, 11 May, 13:00, met.no Research Department Building, 3rd floor meeting room. More details |
25 |
Progress Meeting 3-δ | Mon/Tue 6/7 December, 2004 | DMI, København | PM3-δ Agenda PM3-δ minutes, PM3-δ Presentations |
Monday, 6 December 2004, 15:00 till Tuesday, 7 December 2004, 15:00. |
28 |
Progress Meeting 3 | Thu/Fri 3-4 Mar, 2005 |
DTU, København | PM3 Agenda, PM3 Minutes, PM3 Presentations |
Thursday, 3 March, 9:00 till Friday, 4 March, 16:00; UAG: Friday, 4 March, 9:00 till 16:00 |
32 |
Progress Meeting 4 | Thu/Fri 16-17 Jun 2005 |
met.no, Oslo | PM4 Agenda,
PM4 Minutes (draft), PM4 Presentations |
Thursday, 16 June, 13:00 - Friday 17 June, 13:00. |
36 |
Final Presentation | Thu/Fri 6-7 Oct 2005 |
IUP, Bremen | FP Agenda,
FP Minutes, |
University of Bremen, Building NW1, room 0-1210
("Pavillion" on 1st floor) Thu 6 Oct, 9:15-17:00: Consortium and User Advisory Group. Fri 7 Oct, 9:00-afternoon: Consortium |
Month | Report description | Due date | Note |
---|---|---|---|
6 | Management Report | May 2003 | |
12 | Management Report | Dec 2003 | => Section 1 of Annual Report (see next row) |
Annual Scientific and Technical Report: PDF (495kB); gzipped PS (1.6MB) | Dec 2003 | Completed/Submitted. | |
Draft of TIP | Dec 2003 | Details on registered results to be filled in: eTIP web site (for login and password: ask Christian) | |
Periodic Cost Statements | Dec 2003 | Received/Submitted. | |
18 | Management Report: PDF (160kB); gzipped PS (1.1MB) | June 2004 | Completed/Submitted. |
24 | Management Report | Dec 2004 | => Section 1 of Annual Report (see next row) |
Annual Scientific and Technical Report PDF (2.5MB); | Dec 2004 | Completed/Submitted | |
Draft of TIP | Dec 2004 | Details on registered results to be filled in: eTIP web site (for login and password: ask Christian) | |
Periodic Cost Statements | Dec 2004 | Received/Submitted
|
|
30 | Management Report: PDF (220 kB) | June 2005 | Completed/Submitted
|
36 | Management Report | Nov 2005 | Section 1 of Final Report (see next row) |
Final Report (PDF, 5.8 MB) | Nov 2005 | Completed/submitted | |
Final TIP | Nov 2005 | Completed/submitted. See eTIP web site | |
Final Cost Statements | Nov 2005 | Submitted | |
Stand-alone version of the Final Report | Overall scientific results of IOMASA. This is Section 5 ("Executive Summary") and Section 6 ("Detailed Report, Related to Overall Project Duration") of the contractual Final report (Sections 1 to 4 of which contain Management and Progress reports covering the last project year) |
twv_algo
found
int the file twv_algo.pro
.
This algorithm needs two files with calibration constants. They are
read by an IDL routine read_calfile
which is also contained in
the file twv_algo.pro
. The
calibration constants suitable for the Arctic, derived from
radiosonde data from 1996-2001, are here:
For details on the algorithm see this PM-2
presentation (PDF, 516k).
Sensor (Satellite) |
Type |
Source |
Area coverage |
Time period |
Format |
Where |
Notes |
---|---|---|---|---|---|---|---|
AMSU-B (NOAA-15,16) | level 1B |
NOAA SAA | global |
2000-2003 |
IUP |
details |
|
AMSU-B (NOAA-15,16) | level 1B |
NOAA SAA | global |
1999-2003 |
IUP |
details |
|
Seawinds (QuikSCAT) | level 2A |
JPL PODAAC |
2001-2002 |
HDF |
DMI |
details | |
SSM/I (F-14) | NOAA/NESDIS | 2001-2002 |
BUFR |
details | |||
Radiosonde (stations) |
DMI |
global |
1996-2002 (Nov.) | TEMP |
details | ||
Radiosonde RV Polarstern |
AWI |
Arctic, Antarctic seas |
(research cruises since 1998) | ASCII |
details |
Geophysical Parameter | Source (Sensor) | Area Coverage | Time period | Format | Where (Link) | Notes/Info |
---|---|---|---|---|---|---|
Total Water Vapour | AMSU-B | North of 50° | 2001 - 2002 | flat ASCII | iomasa@DTU (password: ask C. Melsheimer or R. Saldo) | Information |
Del. No. |
Deliverable Title |
Proj. Month (Date) |
Type |
Diss. Level |
Type: Re = Report, Da = Data, Me = Method | ||||
Dissemination Level: PU = public | ||||
0 |
Interim and final reports, financial reports | 12, 24,36 |
Re | PU |
Part 1: Remote sensing of atmospheric parameters (IUP) | ||||
1.1 | Baseline data and algorithms for atmospheric remote sensing | 6 | Re/Me (PDF, 208kB), Da | PU |
1.2.1 | Retrieval algorithm for TWV from AMSU-B data | 20 | Re ( PDF, 497kB), Da, Me | PU |
1.2.2 | Retrieval algorithm for cloud signature from SSM/I-B data | 29 (= Mar 2005) | Re, Da, Me | PU |
1.2.3 | Retrieval algorithm for surface emissivity at AMSU-A frequencies | 29 (= Mar 2005) | Re, Da, Me | PU |
1.3.1 | Fields of TWV of investigation period | 32 | Da | PU |
1.3.2 | Fields of cloud signature of investigation period | 32 | Da | PU |
1.3.3 | Operational processing chain for cloud signature | 32 | Re, Da | PU |
1.4 | Validation report for TWV and cloud signature | 36 | Re | PU |
Part 2:
Improving numerical weather prediction models (met.no, SMHI) | ||||
2.1.1 | Report on setup of operational data stream | 6 | Re (PDF, 1.6MB) | PU |
2.1.2 | 2 data years of NWP fields: Wind, TWV,liquid water path, and surface temperature | 6 | Da | PU |
2.2.1 | Report and programme code on humidity assimilation into NWP | 29 (= Mar 2005) | Re, Me | PU |
2.2.2 | Report and programme code on temperature assimilation into NWP | 29 (= Mar 2005) | Re, Me | PU |
2.2.3 | Report and programme code on interface implementation (sea ice) | 29 (= Mar 2005) | Re, Me | PU |
2.3 | Report on real time assimilation system for TWV and improved temperature assimilation | 32 | Re, Da | PU |
2.4 | Validation report on assimilation impact | 36 | Re | PU |
Part 3: Empirical model for emissivity and backscatter of sea ice (DTU-DCRS) | ||||
3.1.1 | Offline data and day 0 algorithms for Part 3 | 6 | Re/Me (PDF (3.7MB), gzipped PS (2.2MBB)) Da | PU |
3.1.2 | HIRLAM data of project year 1 | 12 | Da | PU |
3.2.1 | Report and programme code for emissivity and backscatter model of sea ice | 22 (= Aug 2004) | Re (PDF, 497kB), Me | PU |
3.2.2 | Report on improvement potential with sensors AMSR(-E) | 22 (= Aug 2004) | Re (PDF, 3.0MB) | PU |
3.3 | Report and programme code for influence of snow | 32 | Re, Da | PU |
3.4 | Validation report for sea ice model | 36 | Re | PU |
Part 4: Sea ice concentration retrieval (DMI) | ||||
4.1 | Data sets and day 0 algorithms for sea ice retrieval | 6 | Re (PDF, 111kB), Da | PU |
4.2 | Report and programme for retrieval of sea ice concentration | 29 (= Mar 2005) | Re/Me | PU |
4.3 | Sea ice concentration data set of investigation period | 32 | Da | PU |
4.4 | Validation report for sea ice retrieval | 36 | Re | PU |
Part 5: Real time processing and user interface (DTU-DCRS) | ||||
5.1 | Data formats and software interfaces for real time production | 12 | Re | PU |
5.3 | Real time production and distribution system | 32 | Re, Da | PU |
5.4 | Demonstration report and data | 36 | Re, Da | PU |